Home

Contact Us

Management and Staff

Meetings and Minutes

Policies and Resolutions

Regulatory Obligations

Facility Description

Plant Processes

Projects

Current Projects

Flow Reports

Links

Nine Minimum Controls (NMC)

NMC No. 4 - Maximization of Flow to the Publicly Owned Treatment Works (POTW) for Treatment

This NMC entails making modifications to the CSS and the POTW to allow as much wet-weather flow to reach the POTW as possible.  The goal is to minimize the magnitude, frequency and duration of the CSO's.  The Federal EPA recommends that the following minimum measures be considered in implementing this control.

  • Determine the capacity of the interceptors and ensure that the full capacity is available.

  • Analyze existing records to compare flows processed by the plant during wet weather and dry periods and determine the relationships between performance and flow.

  • Compare the current flows with the design capacity of the overall facility, as well as the capacity of the individual unit processes. Additionally, this may include identification of locations of available excess capacity.

  • Determine the ability of the POTW to operate acceptably at incremental increases in wet-weather flows, and estimate the effect on the POTW's compliance with the effluent limits in its NPDES permit.

  • Determine whether unused treatment units at the POTW can be used to treat or store wet weather flows.

  • Develop project and O & M cost estimates for any proposed modifications.

 

Search

WEB SITE DESIGNED BY:  JMS  Design  Consulting  Inc
Send mail to info@jmsdci.com with questions or comments about this web site.
Copyright © 2002 Western Westmoreland Municipal Authority
Last modified: February 03, 2012

Hit Counter